The project is proposed to connect into the existing 220 kV Shepparton Terminal Station (SHTS) – Fosterville Tee Terminal Station (FVTS) transmission line that runs through the site.
New interconnection infrastructure will be required to connect the project to the existing line. This includes infrastructure such as a switching station and a substation.